This project involved the construction of a single storey 72 bedroom hospital adjacent an existing live hospital.
This contract involved the development of a new business park and included site preparation.
This contract involved the site development of a 10 acre pharmaceutical plant site in Limerick.
This contract involved ORPH Ltd setting up the compound, the installation of E.S.B and optic fibre ducting
The work involved compound set up, internal & external drainage and more.
Alza Production Facility project consisted of a two-storey production building with production on the ground floor and fan deck over.
Lyrath Estate, Hotel, Spa & Convention Centre – This 5 star hotel project involved the retention and refurbishment of the existing Victorian Country House, and more.
Complex refurbishment and development project which entailed the demolition of A5 story building and an 80ft chimney stack.
ORPH Ltd carried out the site development works for the construction of the classroom building.
The development of a 400 student campus green field site.
This job involved demolishing part of the hospital and building on a new block.
This project involved the preparation of the site (old textile factory) with extensive demolition work and asbestos removal.
Pfizer Newbridge have internal works carried out on the Eliquis project. OR Plant hire Ltd. installed internal drainage this was carried out using electric digger and dumper. Concrete works were completed on floors, plinths and upstands.
AbbVie is a pharmaceutical plant in Carrigtwohill, Co Cork.
A SISK contract where the Oratory was demolished and relocated with upgrades to the shopping centre started in 2016.